Technical due diligence for development sites
Contents |
[edit] Introduction
By 'technical due diligence' we are referring to the process of investigating a site to assess its suitability for a particular project and the risks involved before proceeding with that project. A due diligence checklist is presented below, providing a list of some of the aspects of a site and its context that it may be necessary to investigate.
[edit] Site information
- Site address (including post code).
- Site location map.
- Contact details for neighbours.
- Access assessment and arrangements.
- Site logistics assessment.
- Site security.
[edit] Legal searches
- Deeds and title Information.
- Ownership (including boundaries and possible disputes).
- Central and local government planned works within the vicinity of the site.
- Possible compulsory purchase orders.
- Part wall appraisals and surveys.
- Rights of light appraisals and surveys.
- Way leave agreements (telecommunications, electrical networks, etc.).
- Existing licences.
- Easements (rights of way, right to light, the right for underground services to pass beneath the land of a neighbouring property, right of support, the right to draw water, etc.).
- Restricted covenants.
- Tree Preservation Orders or other tree rights.
- Listed buildings.
- Conservation areas, or other designated areas (such as national parks, areas of outstanding natural beauty and the Norfolk and Suffolk Broads).
- Scheduled monuments.
- Building regulations approvals.
- Statutory waterways and any associated restrictions.
- Railways and any associated restrictions.
- On site adverts.
- Civil Aviation Authority restrictions.
- Car parking licences and agreements.
- Existing occupants and illegal occupation.
[edit] Surveys
- Topographical survey.
- Existing building survey (including valuation, measured surveys, structural surveys, structural investigations, condition surveys and demolition surveys).
- Historic use report.
- Site investigations.
- Contamination survey.
- Boundary surveys.
- Structural survey (including retained structures, underground structures and obstructions).
- Unexploded bomb survey.
- Railway and tunnel search.
- Air quality.
- Archaeological survey.
- Asbestos and other deleterious materials surveys and registers.
- Local area transport infrastructure (adequacy and future use).
- Ecology survey.
- Local climate.
- Photographic survey.
[edit] Site services
- Fire hydrants.
- Telecommunications.
- Wireless networks and satellite reception.
- Electrical infrastructure and capacity.
- Gas network infrastructure and capacity.
- Foul sewers and drains infrastructure and capacity.
- Existing water supply infrastructure and capacity.
[edit] Planning
- Planning applications and approvals for the site and within the vicinity of the site, including conditions and obligations (agreed or in draft).
- Social and economic desktop study.
- Access statement.
- Statement of community involvement.
- Cumulative impact report.
- Visual impact assessment.
- Sustainability statement.
- Heritage report.
- Traffic assessment.
- Flood risk.
- Air quality.
- Acoustic environment and noise.
[edit] Related articles on Designing Buildings Wiki
- Applying for new postal addresses.
- Building People.
- Caveat emptor.
- Condition.
- Condition Report.
- Condition survey.
- Contaminated land.
- Deleterious materials
- Demolition.
- Development appraisal.
- Due diligence.
- Easements.
- Ecological survey.
- Environmental Impact Assessment.
- Feasibility studies.
- Ground conditions.
- Gross development value.
- Lawful development certificate.
- Planning permission
- Pre construction information.
- Rights of way.
- Site appraisals.
- Site information.
- Site selection and acquisition.
- Site surveys.
- Soil survey.
- Tree preservation orders.
- Tree rights.
- Vendor survey.
[edit] External references
- RICS Best Practice & Guidance Note for Technical Due Diligence of Commercial, Industrial & Residential Property in Continental Europe.
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.






















